Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 20 results ...

Al-Mhdawi, M K S (2022) Risk management of construction projects under extreme conditions: a case study of Iraq, Unpublished PhD Thesis, , University of Southampton.

Al-Sasi, B O (2007) A lean approach to capacity management in construction, Unpublished PhD Thesis, , University of Southampton.

Alfadhli, A (2013) Does the alternative dispute resolution have a role to play in the construction industry in the State of Kuwait?: look into the most appropriate methodology that may be taken in Kuwait in comparison with what are available in the English legal system, Unpublished PhD Thesis, Law School , University of Southampton.

Almeile, A M (2021) The role of political and economic stability on the success of public-private partnership (PPP) construction projects from a project management perspective, Unpublished PhD Thesis, , University of Southampton.

Baker, T O (2021) An investigation into pricing anomalies and the influence of information processing constraints on forecasts derived from sports betting markets, Unpublished PhD Thesis, , University of Southampton.

Bakhoum, E S H (2011) A decision support system for evaluation and selection of structural materials on a sustainability basis, Unpublished PhD Thesis, Civil Engineering, University of Southampton.

Barr, D W J (2004) The department of trade and industry key performance indicators: A critical appraisal, Unpublished PhD Thesis, , University of Southampton.

  • Type: Thesis
  • Keywords: accuracy; measurement; project team; reliability; key performance indicators; performance improvement; project delivery; UK; project performance; case study; validation; construction project
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/305036113
  • Abstract:
    The Department of Trade and Industry Key Performance Indicators (DTI KPIs) provide the performance measurement framework most widely used by the UK construction industry. By 2003 the DTI KPIs had been used on construction contracts with a combined value in excess of £6 bn. Despite a growing number of construction projects using the DTI KPIs there has been little literature investigating the accuracy or reliability of them. This thesis investigates and evaluates the DTI KPIs in a more detailed and rigorous manner than previously attempted. The literature also identified a plethora of alternative selection and procurement methodologies claiming to deliver performance improvement but with no universally accepted approach to measuring the performance improvement each method claims to deliver. Furthermore, performance measurement literature stated the need for, but lack of, an aggregate scoring method facilitating quantitative comparison of overall project performance. The research methodology of this research uses a detailed case study approach to evaluate the performance of a construction project with data collected throughout the entire project delivery process, resulting in the creation of an overall performance matrix. In addition to this matrix the project team completed a questionnaire on a monthly basis. These two established forms of performance measurement allowed comparison with DTI KPI results and evaluation of the reactive rather than proactive nature of the indicators. A methodology was developed that calculated an aggregate project performance score by measuring radar chart surface area. This Surface Measurement of Performance (SMOP) approach was used to establish the sensitivity of the DTI KPIs which was found to be between +/-5% and +/-10%. The SMOP programme allowed validation of the findings from the case study and also made quantitative project performance comparison possible. Investigation of the method in which the DTI KPIs are calculated showed several areas in need of review. The role of the benchmark conversion curves are investigated, in particular the method of calculation of the predictability scores and the inclusion of indicators that reflect project performance and those that reflect company performance without distinction. The segregation of design and construction performance by the DTI KPIs is considered, as is the predictive and reactive natures of the indicators used. Recommendations are made in the thesis that address many of the above issues and conclusions are drawn on the potential for development of the DTI KPIs from a construction project 'post mortem' into a genuine performance management tool.

Brown, D C (2003) A methodology for selecting the construction team, Unpublished PhD Thesis, , University of Southampton.

Buckingham, H (2010) Accommodating change? An investigation of the impacts of government contracting processes on third sector providers of homelessness services in South East England, Unpublished PhD Thesis, School of Social Sciences , University of Southampton.

Curtis, B (1994) Roles, responsibilities and risks in management contracts, Unpublished PhD Thesis, , University of Southampton.

Day, K D (1989) The administration of the 'botched' FIDIC contract: the problems arising out of the administration of a wrongly 'slanted' contract for turnkey projects, Unpublished PhD Thesis, , University of Southampton.

Fernandes, A G G (2014) Improving and embedding project management practice in organisations, Unpublished PhD Thesis, , University of Southampton.

Gul, S (2012) The role of conflict & negotiation in the complexity of projects, Unpublished PhD Thesis, , University of Southampton.

Jang, S G (2011) A concessionaire selection decision model: development and application for the PPP project procurement, Unpublished PhD Thesis, School of Management , University of Southampton.

Jones, B K (1998) A model for collaborative engineering the construction industry, Unpublished PhD Thesis, , University of Southampton.

Ludlow, J E (1976) Assessment and prediction of noise from construction sites, Unpublished PhD Thesis, , University of Southampton.

Moustafa, I M M (2001) A decision support system for the selection of the optimum contractor, Unpublished PhD Thesis, , University of Southampton.

Park, J (2011) Best-value in Korean public building construction, Unpublished PhD Thesis, School of Management , University of Southampton.

Rempelos, G (2023) A whole life carbon model for railway track system interventions, Unpublished PhD Thesis, , University of Southampton.

Riley, M J (2001) Re-engineering the construction procurement process, Unpublished PhD Thesis, , University of Southampton.